Home / Services / Drinking-water report figures

Civil drafting throughout New Zealand

Drinking water report New Zealand: figures and document production

Drinking-water documentation is careful, repetitive work: plans, process figures, maps and a report laid out to a standard your engineer can stand behind. If that production is holding the job up, hand it to us.

We prepare the figures, maps, plans and document layout from your engineer's inputs, calculations and findings. Your engineer reviews, signs and carries responsibility for the assessment. We do not certify water quality, give compliance opinions, or take engineering responsibility. The drinking-water supplier remains responsible for the supply under the Water Services Act and the Drinking Water Quality Assurance Rules.

What we typically produce

  • Layout and formatting of a drinking-water compliance report, water-supply assessment, or Drinking Water Safety Plan (DWSP)
  • Scheme, process and catchment figures
  • Supply-location and reticulation plans, drawn from your design
  • Source-water risk figures, where your engineer has provided the content
  • Tables and monitoring summaries set out from your data
  • Redraws of existing figures to your current title block and standard

What we need from you

The report draft or headings, the engineer's findings and calculations, any source plans or GIS, and your template. We will not fill gaps with our own assessment.

Where this is used

Work of this kind is prepared for drinking-water suppliers, councils and consultants throughout New Zealand. We draft to the document standard you specify for that supply or that territorial authority.

Send the draft report and the source figures.

Get a fixed quote Common questions

Get a quote